Azure Daily Usage Forecast by Subscription Details
Azure Daily Usage Forecast by Subscription Details plots the future cost per subscription. This report appears as drill down report of Azure Daily Usage Future Forecast by Org Level, when you click the value in the #Subscriptions column.
Table: Azure Daily Usage Forecast by Subscription Details
Column name | Description |
|---|---|
|
#Subscriptions |
The number of subscriptions associated with these three levels. This is a drill-down link to the subscription details report. |
|
Usage History |
A sparkline depiction of the daily storage cost values. |
|
Linear trend |
A sparkline depiction of the linear slope of the daily storage cost. |
|
PTD Cost |
The sum total of storage cost for the time period selected. |
|
Largest Day |
The largest single day storage cost within the time selected period. |
|
Avg Day |
The average daily storage cost within the time period selected. |
|
#Days |
The number of days returned based on the date range selected. Note: #Days could be less than that depending on when the data collection started. |
|
First Date |
The first date found within the time period selected. |
First Value | What your daily cost was on the first date of the period. |
Last Date | The most recent date found within the time period selected. |
Last Value | What your daily cost was on the last date of the period. |
|
Daily Change Linear | The amount of cost change on a daily basis on a linear regression algorithm. (The slope is based on the best fit sum of squares.) |
%Change Linear | The percentage of daily change |
Cost Change | A verbal description of the cost change between the first date and the last date. This value can be used to filter, such as to show only where the cost "Increased". |
Trend | A visual depiction of how the cost is trending. Represents the up, down, or flat trend. |
Probability | The coefficient of determination (R²) how well a statistical model predicts an outcome. |
30 Day Forecast | Forecast of the PTD cost in the next 30 days based on the Daily Change Linear value. |
6 Month Forecast | Forecast of the PTD cost in the next 6 months based on the Daily Change Linear value. |
1 Yr Forecast | Forecast of the PTD cost in the next year based on the Daily Change Linear value. |