About Distribution chart display options
The following display options are available for Distribution reports:
|
Chart Type |
Select from the drop-down list. |
|
Report On |
Select the entity that you want to see in the report like Attempt Status. |
|
Report Data |
This is the data that should be plotted on the pie chart. |
|
Time Basis |
Metric used for assigning a time to each item in the report, if not specified by the Report Data parameter. Example: The start time or the end time for each backup job. |
|
Description |
Description to display along with the report. If you leave this field blank, no description is provided by default. |