About Distribution chart display options
The following display options are available for Distribution reports:
Chart Type | Select from the drop-down list. |
Report On | Select the entity that you want to see in the report like Attempt Status. |
Report Data | This is the data that should be plotted on the pie chart. |
Time Basis | Metric used for assigning a time to each item in the report, if not specified by the Report Data parameter. Example: The start time or the end time for each backup job. |
Description | Description to display along with the report. If you leave this field blank, no description is provided by default. |