Hardware installation proceduresThis section includes the following topics:OverviewInstalling a storage shelfInstalling disk drives into a full-capacity storage shelfInstalling disk drives and blanks into a half-capacity storage shelfInstalling disk drives into a half-capacity storage shelfInstalling the compute node rack railsInstalling the compute node into a rackConnecting the hardware to one compute nodeConnecting the hardware to two compute nodesConnecting NetBackup nodes to the networkConnecting Flex nodes to the networkConnecting the power cordsTurning on the hardware and verifying operationConfiguring the IPMI port from the NetBackup Appliance Shell MenuConfiguring the Veritas Remote Management Interface from a Flex ApplianceConfiguring the Veritas Remote Management Interface using laptopAccessing and using the Veritas Remote Management interface