Hardware installation proceduresThis section includes the following topics:OverviewInstalling a storage shelfInstalling disk drives into a storage shelfInstalling the storage shelf bezelsInstalling the compute node rack railsInstalling the compute node into a rackConnecting the hardwareConnecting Access nodes to the networkConnecting the power cords to the hardwareTurning on the hardware and verifying operationConfiguring the IPMI port from the Access Appliance shell menuAccessing and using the Veritas Remote Management interface