Failing over or failing back a replication job for VVR
To failover or failback a replication job
- Prerequisites:
Configure at least one storage pool.
Set up a replication virtual IP address.
Set up a replication link.
For volume-level replication, select a file system and provide a replication link.
- Go to File Systems > Replication: At the ellipses, select Failover Job or Failback Job.
- Follow the wizard prompts.
- View the Recent Activity panel for the status of the task.